´╗┐

Retired 31 June 2018. Discrete Manufacturing Advanced in Microsoft Dynamics AX 2012


Introduction 

This two-day instructor-led course, Discrete Manufacturing Advanced in Microsoft DynamicsAX 2012, provides students with the necessary tools and resources to perform basic tasks in the Discrete Manufacturing Advanced flow in Microsoft Dynamics AX 2012. 

Outcomes

At the completion of this course, participants will be able to:

  • Review multisite functionality for the Production control module
  • List the Production control module's core conceptual elements
  • Review the Bill of material (BOM)
  • Review calendars and resources
  • Review operations and routes
  • Describe production life cycle, parameters, and production orders
  • Review definitions of operations and job scheduling
  • Review how master planning interacts with the Production control module
  • Describe product, storage and tracking dimensions
  • Explain how to set up and work with dimensions groups
  • Describe using serial or batch numbers to track and control manufactured items
  • Use inventory reservations in production
  • Describe inventory marking
  • Describe the inventory trace function
  • Describe how inventory dimensions are affected by multisite functionality
  • Describe working with the Bill of Materials (BOM) line type Vendor when using subcontractors
  • Describe how to generate purchase orders to a supplier when on-hand inventory is insufficient
  • Describe how to create a vendor production order
  • Create resources and groups for the vendor
  • Define production groups to establish a relationship between production orders and ledger accounts.
  • Describe how to use production pools to monitor production orders in specific categories.
  • Describe properties-set up on the working time template-which guide production orders to run under special times and conditions.
  • Attach a property to a resource.
  • Review the benefits of properties.
  • Describe how resource capabilities are set up and used to schedule production on alternative resources.
  • Create route groups and attach them to operations on a route.
  • Use the various scheduling methods.
  • Discuss the difference between operations and job scheduling.
  • Split a production order.
  • Set the Bill of Material (BOM) scrap percentages.
  • Set the scrap percentage on a Resource.
  • Set the scrap percentage for each operation in production routes.
  • Describe the costing of scrap.
  • Review steps in the production order life cycle
  • Describe production order ledger setting options
  • Define default ledger settings in production parameters
  • Describe production journals and how consumption is reported to the general ledger
  • Assign ledger settings for production groups
  • Analyze actual versus estimated costs for production orders and current production activities
  • Describe End and cost account production orders
  • Describe the interconnectivity of the production module with other modules in Microsoft Dynamics AX 2012
  • Describe the main elements of the production implementation checklist
  • Set up production parameters
  • Modify data types used by the productions series
  • Set up item groups and items
  • Set up BOMs
  • Describe the creation of working time templates, calendars, Resource groups, and Resources
  • Set up operations and routes



User Reviews

Not yet rated. You will need to follow this course before you can write a review.

Course Info


Next Step

Enquire Now
Tell a Friend
Email Course Outline